Norm Spaces
Progress rate
4%
Completed Works During May 2026 (Norm Spaces)
Completion of the first soil borehole at a depth of 30 meters
Current Ongoing Works
Site preparation works for soil testing and the required engineering consultations
Completion of the full site leveling works for the project land
Commencement of excavation works from ground level (first meter of excavation)